The Stage I Voluntary Conservation under the Water Shortage Response Plan is officially lifted. The Graham—Mebane Water Treatment Plant is operating at 100% to supply water to Mebane and has returned to full Duke Energy primary power.   

New Water Shortage Update 

Spillway Update

If you would like to have updates from Code Red alerts, sign up Here

If you have questions, please review the Water Shortage Response Plan

The Mebane Emergency Operations Center (EOC) officially closed Friday at 5 p.m., and the (919) 304-9235 number will no longer be active.
 If you need to report storm damage or have any questions or concerns, please call the Mebane Police Department at (919) 563-9031.

Request for Qualifications – Mebane Sanitary Sewer Rehabilitation

Posted on September 24, 2024


The City of Mebane is requesting qualified professional engineering firms to submit a statement of qualifications to provide engineering and surveying services for approximately 16,800 feet of 8” through 16” sewer line rehabilitation by CIPP lining and associated manhole rehab. This project will be funded by a Building Resilient Infrastructure and Community (BRIC) Grant and Directed Project Appropriations.  Project tasks will include, but not limited to:

• Grant/Loan Administration
• Field Surveying, Preliminary Engineering, and Final Design Drawings.
• Project Permitting
• Completion of Bid Documents (including Specifications and Final Design Drawings for the project).
• Bidding and Recommendation of Contract Award.
• Construction Observation and Administration.
• Construction Closeout.

Please review the Request for Qualifications – Mebane Sanitary Sewer Rehabilitation for more details.

Please submit your Qualifications by electronic submittal, to be received by the City no later than 2:00 PM, October 18, 2024, to the attention of:
Kyle Smith, Public Utilities Director, City of Mebane ksmith@cityofmebane.com

Close window